News View all

LaBella’s PFAS Experience Featured in American City & County

 

LaBella’s Aztech Environmental team has been at the forefront in helping communities find solutions for PFAS (Perfluoroalkyl substances) contamination.  Click here to read a case study (which also presents an easy-to-understand overview of the problem) about our work with the Town of New Windsor, NY.

About the Author
Fil Fina III, PE
Remedial Design Program Manager

Fil has over 34 years of experience as an engineer in the environmental field. As Remedial Design Program Manager, he manages all engineering and environmental affairs. Fil is responsible for all remediation system design, fabrication, and installation, including soil vapor extraction, sub-slab depressurization, groundwater pump and treatment, free product removal, high-vacuum extraction, total fluids extraction, oxygenation, vapor intrusion abatement, in situ chemical oxidation, excavation and dewatering, sludge dewatering and clarification, and landfill leaching processing systems